Cultivating Success in Cannabis —

Facilities designed, equipped and tuned by people who have run them.

Facility design, cultivation optimization and the equipment to run it, from 1M+ sq ft of builds.

Shop Equipment
Trevor Christensen, FounderTrevor Christensen, Founder
1M+ sq ftdesigned and renovated
95%+ pass ratesacross 250,000+ sq ft
13 → 35 lbsper container, one engagement

Start here —

Where are you in your facility journey?

Five stages sit between a license application and product on the shelf. Pick yours and we’ll hand you the playbooks we wrote from 1,000,000+ sq ft of builds.

Select the stage you’re in to see the content for your phase, then use Next to walk the rest of the trail.

  1. Stage 1 of 5 · Ideation & Financing —

    Prove the model before you sign a lease.

    Lenders and investors fund operators who can show throughput, cost per gram, and a facility plan that matches the license. We build the financial model, pressure-test the assumptions, and structure the financing that actually closes in cannabis.

    985%documented ROI, Client 1 engagement
Where are you —

Two doors. Pick the one that matches your desk.

Building a new facility

From license award to first harvest, without the redesign

1M+ sq ft designed and renovated. Program, rooms, environment and equipment schedule set before concrete.

The Urth & Fyre difference —

Same container room, one engagement later.

Drag the handle. Same room, same footprint, second harvest after the engagement.

Same container room at full canopy after the engagement
Container grow room early in flower before the engagement
Before13 lbsper container per harvest
After35 lbsper container per harvest
Confirmed figures
0 lbs
from 23 per room, second engagement
0%+
microbial pass rates across 250,000+ sq ft of canopy
0%
documented ROI on one engagement
Design package —
Program, rooms, environment and equipment schedule, set before concrete.
See the Facility Design Package
One engagement, from site to first harvest —

Four steps. Each one stands on its own.

The equipment desk —

Specified by the people who design the room.

0%+
microbial pass rates across 250,000+ sq ft of canopy. Most failed batches are a systems problem, and the fix is usually cheaper than the loss.
Put a number on your losses
FAQ —

You have cultivation questions. We have cultivation answers.

What does cannabis facility design cost?

Design runs $150 to $500+ per square foot depending on room count, environment and the equipment schedule. The assessment tells you which end of that range you are on before you commit.

Answered by Trevor Christensen
How long does it take?

30 to 60 days for an optimization of a room that already runs. 3 to 6 months for a ground-up build, from program to commissioning.

Answered by Trevor Christensen
Do you work on existing facilities?

Yes. Most engagements start in a room that already runs: yield, microbial pass rate or cost per gram is off, and the assessment finds why.

Answered by Trevor Christensen
Do you sell new and used equipment?

Both. Used inventory is inspected before it lists; new equipment comes through the brands we distribute and specify.

Answered by Trevor Christensen
Which states do you work in?

Anywhere with a license.

Answered by Trevor Christensen
What does an assessment involve?

A review of the room or site, on-site or remote, a findings report with ranked fixes, and a call to walk through it.

Answered by Trevor Christensen
Tell us where you are —

Ready to cultivate success?

Routes to Trevor. Hidden fields ride along.
This is some text inside of a div block.
This is some text inside of a div block.